New construction of the Auwald sports centre of the municipality Gundremmingen

Sport and nature in the alluvial forest

Project details

In 2014, the municipality of Gundremmingen together with the sports club and the shooting club built a sports facility including an event foyer with a stage.
The multi-purpose building consists of a 2-fold gymnasium in the size 22x44m as well as an outdoor stage along the football field.
For the shooters a shooting range for small calibres with 25m and 100m shooting ranges as well as 16 air rifle shooting ranges were built.
The centre of the entire facility is the event foyer with a stage for approx. 350 people.

Schuster engineering carried out the complete architectural work, the structural design and the fire protection concept.