Infrastrukturplanung für die VERBIO Diesel Bitterfeld GmbH

New construction of biodiesel plant

Project details

VERBIO AG built a biodiesel plant in Bitterfeld with an annual capacity of 200,000 tons of biodiesel and 25,000 tons of pharmaceutical glycerine.
SCHUSTER engineering worked here as a general construction planner and also planned the complete infrastructure.

  • Access road with logistics areas including sewer network
  • Gate with scale
  • parking spaces