Adolf Jass Schwarza GmbH & Co. KG

New construction of the PM1 paper mill in Schwarza

Project details

Papierfabrik Adolf Jass GmbH invested in the construction of a new paper mill for corrugated base paper at the Rudolstadt-Schwarza site.
The annual production capacity is 400,000 tons. The paper machine has a wire width of 8.25 m and a production speed of 1,400 m/min.
SCHUSTER engineering was responsible for the construction of the entire paper machine including stock preparation and reel tower storage as well as a three-storey office building.